Refer to problems 33 and 34. Brazil Brewery hired an engineering consulting firm to perform an engineering estimate of beer production costs. The consulting firm came up with the following monthly cost estimates based on information for the current period:

Facilities costs……………………………………………. $26,008.00

Beer production level costs…………………………..$13.5 per hL produced

Raw materials costs……………………………………..$0.70 per kg consumed

Batch level costs………………………………………… $60 per batch

Water costs………………………………………………… $0.90 per hL consumed

CIP costs…………………………………………………… $18.5 per CIP performed

New product costs………………………………………. $500 per new product

Required:

Assuming the following level of cost driver volume for a month, what is the estimated cost using the engineering estimates? (Don’t forget to include the facilities costs in your estimate.)

1,650…………………………….. hL of beer produced

25,500…………………………… kg of raw materials consumed

100……………………………….. Batches

10,800…………………………… hL of water consumed

120……………………………….. CIPs

1…………………………………… New product