Volt Gear Industries manufactures two types of electrical power units, custom and standard, which involve four overhead activities—production setup, procurement, quality control, and materials management. An activity analysis of the overhead revealed the following estimated costs and activity bases for these activities:

Activity

Cost

Activity Base

Production setup

$ 48,000

Number of setups

Procurement

118,000

Number of purchase orders

Quality control

160,000

Number of inspections

Materials management

115,000

Number of components

Total

$441,000

 

The activity base usage quantities for each product are as follows:

 

 

Purchase

 

 

 

 

Setups

Orders

Inspections

Components

Unit Volume

Custom

375

900

1,800

300

3,000

Standard

125

100

200

200

3,000

Total

500

1,000

2,000

500

6,000

a. Determine an activity rate for each activity.

b. Assign activity costs to each product, and determine the unit activity cost using the activity rates from part (a).

c. Assume that each product required one direct labor hour per unit. Determine the per unit cost if factory overhead is allocated on the basis of direct labor hours.

d. Explain why the answers in parts (b) and (c) are different.