Performance Products Corporation makes two products, titanium Rims and Posts. Data regarding the two products follow:

Direct

Labor Hours Annual

per unit Production

Rims 0.50 27,000 units
Posts 0.10 53,000 units

Additional information about the company follows:

a. Rims require $24 in direct materials per unit, and Posts require $16.

b. The direct labor wage rate is $11 per hour.

c. Rims are more complex to manufacture than Posts and they require special equipment.

d. The ABC system has the following activity cost pools:

Estimated Activity

Estimated Activity
Activity Cost Pool (and activity measure) Overhead Cost Rims Posts Total
Machine setups (number of setups) $ 15,525 75 60 135
Special processing (machine hours) $ 72,000 3,600 0 3,600
General factory (direct labor hours) $ 206,800 13,500 5,300 18,800

1.

Compute the activity rate for each activity cost pool. (Round your final answers to 2 decimal places.)

Activity Cost Pool Activity Rate

Machine setups ?per setup

Special processing ?per setup

General factory ?per setup

rev: 02 15 2011

2.

Determine the unit product cost of each product according to the ABC system. (Do not round intermediate calculation. Round your final answers to 2 decimal places.)

Unit product cost of Rims $

Unit product cost of Posts $