Fogerty Company makes two products, titanium Hubs and Sprockets. Data regarding the two products follow:

Direct
Labor Hours
per Unit
Annual
Production
Hubs 0.90 25,000 units
Sprockets 0.50 49,000 units

Additional information about the company follows:
a. Hubs require $26 in direct materials per unit, and Sprockets require $17.
b. The direct labor wage rate is $19 per hour.
c. Hubs are more complex to manufacture than Sprockets and they require special processing.
d. The ABC system has the following activity cost pools:
Estimated
Overhead
Activity
Activity Cost Pool Activity Measure Cost Hubs Sprockets Total
Machine setups Number of setups $ 17,100 95 76 171
Special processing Machine hours $ 132,000 4,400 0 4,400
General factory Direct labor hours $ 423,000 22,500 24,500 47,000

Requirement 1:
Compute the activity rate for each activity cost pool. (Omit the “$” sign in your response.)

Activity Cost Pool Activity Rate
Machine setups $ per setup
Special processing $ per MH
General factory $ per DLH

Requirement 2:

Determine the unit cost of each product according to the ABC system, including direct materials and direct labor. (Round your answers to 2 decimal places. Omit the “$” sign in your response.)

Hubs Sprockets
Direct materials $ $
Direct labor
Overhead
Unit cost

$

$