Performance Products Corporation makes two products, titanium Rims and Posts. Data regarding the two products follow:
Direct
Labor Hours
per unit
Annual
Production
Rims 0.40 22,000 units
Posts 0.20 85,000 units

Additional information about the company follows:
a. Rims require $16 in direct materials per unit, and Posts require $9.
b. The direct labor wage rate is $15 per hour.
c. Rims are more complex to manufacture than Posts and they require special equipment.
d. The ABC system has the following activity cost pools:
Estimated Activity




Activity Cost Pool Activity Measure Estimated
Overhead
Cost
Rims Posts Total
Machine setups Number of setups $ 22,000 89 75 164
Special processing Machine hours $ 150,000 4,100 0 4,100
General factory Direct labor hours $ 293,000 8,800 17,000 25,800

rev: 02 15 2011, 02_09_2013_QC_26287

1. value:

4.00 points

Required:
1.

Compute the activity rate for each activity cost pool. (Round your final answers to 2 decimal places.)

Activity Cost Pool Activity Rate
Machine setups $ per setup
Special processing $ per MH
General factory $ per DLH

rev: 02 15 2011 check my workreferencesebook & resources

2. value:

4.00 points

2.

Determine the unit product cost of each product according to the ABC system. (Do not round intermediate calculation. Round your final answers to 2 decimal places.)

Unit product cost of Rims $