Provide at least one example of an appropriate cost driver (allocation base) for each of the following activities.
a. Workers count completed goods before moving them to a warehouse.
b. A logistics manager runs a computer program to determine the materials release schedule.
c. Janitors clean the factory floor after workers have left.
d. Mechanics apply lubricant to machines.
e. Engineers design a product production layout.
f. Engineers set up machines to produce a product.
g. The production supervisor completes the paperwork initiating a work order.
h. The production manager prepares materials requisition forms.
i. Workers move materials from the warehouse to the factory floor.
j. Assembly line machines are operated.