From the following particulars, calculate the earnings of two workers, A and B, under (a) straight piece rate system and (b) Taylor’s differential piece rate system:
|
Standard time per unit: 36 seconds |
|
Normal rate per hour: Rs 9 |
|
Differential rates to be applied: |
|
80% of piece rate when below standard |
|
120% of piece rate at or above standard |
|
The workers have produced in a day of 8 hours as follows: |
|
A—700 units |
|
B—900 units |