Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below:

 

 

Standard Quantity
or Hours

Standard Price
or Rate

Standard
Cost

  Direct materials

?

$6.00 per yard

$ ?      

  Direct labor

?

?

?      

  Variable manufacturing overhead

?

$2 per direct
labor hour

?      

  

     

  Total standard cost

   

$?      

  

     
 

  

Overhead is applied to production on the basis of direct labor hours. During March, 770 backpacks were manufactured and sold. Selected information relating to the month’s production is given below:

  

 

Materials Used

Direct Labor

Variable
Manufacturing
Overhead

  Total standard cost allowed*

$18,480      

$16,016

$2,464

  Actual costs incurred

$16,000      

?

$3,460

  Materials price variance

?

   

  Materials quantity variance

$ 720 U   

   

  Labor rate variance

 

?

 

  Labor efficiency variance

 

?

 

  Variable overhead rate variance

   

?

  Variable overhead efficiency variance

   

?

 

 

*For the month’s production.

  

The following additional information is available for March’s production:

  

     

  Actual direct labor hours

1,330  

 

  Standard overhead rate per direct labor hour

$2.00  

 

  Difference between standard and actual cost per backpack produced during March

$0.10  

F

 

  

Required:

 

1.

What is the standard cost of a single backpack?

   

      

2.

What was the actual cost per backpack produced during March? (Round your answers to 2 decimal places.)

   

      

3.

How many yards of material are required at standard per backpack?

   

      

4.

What was the materials price variance for March if there were no beginning or ending inventories of materials? (Do not round intermediate calculations. Indicate the effect of each variance by selecting “F” for favorable, “U” for unfavorable, and “None” for no effect (i.e., zero variance).)

   

      

5.

What is the standard direct labor rate per hour?

   

      

6.

What was the labor rate variance for March? The labor efficiency variance? (Do not round your intermediate calculations. Indicate the effect of each variance by selecting “F” for favorable, “U” for unfavorable, and “None” for no effect (i.e., zero variance))

   

      

7.

What was the variable overhead rate variance for March? The variable overhead efficiency variance? (Do not round intermediate calculations. Indicate the effect of each variance by selecting “F” for favorable, “U” for unfavorable, and “None” for no effect (i.e., zero variance))

   

      

8.

Prepare a standard cost card for one backpack. (Round your answers to 2 decimal places.)