Budgeted factory overhead costs
Listed below are the budgeted factory overhead costs for 2011 for Valpo Manufacturing Inc. at a projected level of 2,000 units.
Expenses:
Indirect materials |
10,000 |
Indirect labor |
20,000 |
Power |
15,000 |
Straight-line depreciation |
30,000 |
Factory property tax |
28,000 |
Factory insurance |
22,000 |
Total |
$125,000 |
Required:
Prepare flexible budgets for factory overhead at the 1,000, 2000, and 4,000 units level. (Hint: You must first decide which of the listed costs should be considered variable and which should be fixed).