Hickory Company manufactures two products – 14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z.

Activity Cost Pool

Activity Measure

Activity Measure

Expected

Activity

Machining

Machine Hours

$200,000.00

10,000

MHs

Machine Setups

Number of Setups

$100,000.00

200

setups

Production design

Number of products

$84,000.00

2

products

General Factory

Direct Labor Hours

$300,000.00

12,000

DLHs

Activity Measure

Product Y

Product Z

Machining

7,000

3,000

Machine Setups

50

150

Production design

1

1

General Factory

8,000

4,000

Required:

1. What is the company’s plantwide overhead rate?

2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y? How much is allocated to Product Z?

3. What is the activity rate for the Machining activity cost pool?

4. What is the activity rate for the Machine Setups activity cost pool?

5. What is the activity rate for the Product Design activity cost pool?

6. What is the activity rate for the General Factory activity cost pool?

7. Which of the four activities is a batch-level activity? Why?

8. Which of the four activities is a product-level activity? Why?

9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?

10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?

11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y? What percentage is allocated to Product Z?

12. Using the ABC system, what percentage of the Machining cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?

13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?

14. Using the ABC system, what percentage of Product Design cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?

15. Using the ABC system, what percentage of General Factory cost is assigned to Product Y? What percentage is assigned to Product Z? Are these percentages similar to those obtained in question 11? Why?